Office to residential conversion Office to residential conversion

Office to residential conversion

  • Timeline:

    discussed individually*

  • Project’s cost:

    discussed individually**

  • Architectural supervision:

    discussed individually

* Depends on the Project

** Price depends on the style and complexity of the Project.

Empty offices are one of the clearest opportunities in Seattle housing, and one of the hardest to design. We help owners and developers decide whether a commercial building can become homes and then design the conversion: unit layouts that bring daylight to every bedroom, new plumbing and ventilation, acoustic and fire separation between homes, and a building that feels residential inside and out.

Our experience with existing buildings is practical. Copper Hall began as a 1990s building; we reconstructed it into a new office building with a copper facade, panoramic glazing and new systems, and designed the interior as well. In Residence 11 an apartment grew from 65 to 103 m², terraces included, by adding a full floor where the height allowed it.

Our portfolio

Stages

Q&A

Can any office building become apartments?

No. Deep floor plates, few windows and difficult plumbing routes can make a conversion uneconomic; a feasibility study shows this before money is spent on design.

What is a test-fit?

A first layout of units on a typical floor that shows how many homes fit and what the main problems are.

Are there incentives for conversions in Seattle?

Yes. Seattle has eased some requirements for these projects and offers a sales and use tax deferral for conversions with at least 10% affordable units.

Have you converted buildings before?

We reconstructed a 1990s building into Copper Hall and added a full floor to an apartment in Residence 11; conversion to housing uses the same skills.

Do you work with engineers?

Yes. Structural, mechanical, plumbing and fire engineers are part of every conversion, and we coordinate their work.

Do you also design the interiors?

Yes: lobbies, corridors, model units and finishes for all apartments.

Does every bedroom in a converted office building need a window?

Yes. That is why the unit walls are drawn against the window rhythm before room sizes are set. Living rooms and bedrooms go on the perimeter, and the deep middle of the floor takes kitchens, bathrooms, laundry and storage. A room that cannot get a window can be offered as a den or study, which changes the unit count, so we show it in the test fit.

Do apartments added inside an existing building in Washington need parking?

Under RCW 35.21.990 a city may not impose parking requirements on units added within an existing building, though it may require keeping parking already needed for remaining residential or nonresidential uses. Cities had to bring their codes in line by June 30, 2026, and the state rule applies directly where they have not. Residents may still want bicycle rooms and storage, so we plan for them.

What usually costs more than owners expect in an office to residential conversion?

Rarely the interiors. The surprises are new plumbing stacks and openings through concrete slabs with firestopping, facade or window work, a seismic upgrade triggered by the change of use, electrical and water service sized for an office, hazardous materials in older buildings and the area lost to corridors and shafts. The feasibility study ranks these drivers for your building so the cost consultant prices the right things.

Can part of the building stay leased while the rest converts?

Often, yes. Ground-floor retail or a few office floors can stay in use while upper floors convert, provided exits, building systems and construction access are kept separate. Building one model unit first is a useful step: it tests details, sound insulation and finishes before they repeat on every floor.

Do you have any more questions?

Choose a method of communication convenient for you

  • Phone
  • Mail
  • Telegram
  • Viber
  • WhatsApp

Contact us

Office to residential conversion in Seattle: what we design

DeZZign helps owners and developers find out whether an office or another commercial building can become homes, and then designs the conversion: the units, the new plumbing and ventilation, the separation between neighbors, the common areas and the interiors. The work covers several kinds of projects:

  • Office to apartments: a full or partial conversion of an office building into rental or ownership homes.
  • Commercial to live-work: workspace at street level with homes above, or units that combine both.
  • Mixed-use repositioning: retail or offices stay on the lower floors and the rest becomes housing.
  • Adaptive reuse: an outdated building gets a new use and a new identity.

Our article Seattle's Skyline Problem: What Happens When the Towers Empty Out explains why downtown has so many candidates and why so few of them convert easily. A second piece, Don't Demolish, Reimagine, looks at industrial buildings in Oslo, Katowice, London, Hamburg and Helsinki that found a second life.

Can this office building become apartments? The feasibility study

A conversion is decided by the building before anyone draws a kitchen. So the first deliverable is a feasibility study with a test fit: a first layout of units on a typical floor that shows how many homes fit and what stands in the way. The owner gets numbers and a list of risks instead of a rendering.

We work through the questions roughly in this order, because each answer limits the next one:

  1. how deep the floor plate is, and how much window perimeter each floor offers;
  2. where the core sits, and whether stairs and elevators can serve apartments;
  3. the column grid and the floor-to-floor height;
  4. where new plumbing stacks and ducts can pass through the slabs;
  5. exits, fire separation and the acoustic upgrade between units;
  6. the approval path for the address and its zoning.

For the study we need whatever drawings exist, a site visit and, where the record set is missing or doubtful, a measured survey. The structural engineer joins early, because a slab that cannot take new openings ends the discussion faster than any zoning rule. Sometimes the honest result is a short report that says the building should stay an office, or convert only partly. That answer costs far less than finding the same thing after design development.

Floor plate depth, daylight and a window for every bedroom

Office floors were planned for desks, and desks can sit far from a window. Homes cannot. Our skyline article uses roughly 30 to 35 feet from the window line as a comfortable planning depth for living space with good daylight. Beyond that, the floor develops a middle that is hard to sell as a home.

Every bedroom needs a window. An office facade rarely lines up with a residential plan, so we draw the unit walls against the mullion rhythm first and only then decide room sizes. A partition that lands in the middle of a window pane forces either an awkward detail or a lost bedroom. Living rooms and bedrooms go on the perimeter. The deep middle takes what lives well without daylight: kitchens open to the living room, bathrooms, laundry, storage and entry halls.

When the plate is too deep even for that, the options are known and each one has a price. A light well or a courtyard cut into the floor brings daylight to the middle but removes area and needs structural work. A room without a window can be offered as a den or study instead of a bedroom, which changes the unit count and the rent roll.

Sealed curtain walls raise a second question. People who sleep and cook behind a facade want fresh air, and many expect a window that opens. Whether the existing glazing can get operable vents, or whether ventilation comes from a mechanical system alone, is decided with the mechanical engineer and checked against the code for your address.

Structural grid, floor-to-floor height and room for new risers

The architect can move a bathroom; the columns stay where they are. A good grid divides into unit widths so that no column lands in the middle of a bedroom or a doorway. Several unit widths are worth testing against the actual grid before a typical floor is settled, since a small change in width can add or lose a unit on every level.

Height matters as much as width. Office floors often carry suspended ceilings, raised floors, large supply ducts and cable trays. Once those are stripped, a floor that felt low as an office can give generous rooms. The useful question is how much height remains after the new work goes in: sprinklers, ducts for each apartment, drain pipes that need a continuous fall, and the acoustic build-up of the floor itself.

New openings through slabs are a structural decision. Post-tensioned slabs carry tendons that must be located by scanning before any coring, and beams cannot simply be pierced wherever a drain would like to go. Seismic condition belongs to the same review. A change from office to residential use can bring an evaluation of the existing structure under the code, and in an older building the upgrade can decide the whole budget, as our skyline article points out for Seattle.

Plumbing stacks, drains and ventilation for many new kitchens and bathrooms

An office floor has one group of restrooms near the core. A residential floor of the same size may need a dozen kitchens and as many bathrooms, spread along the perimeter. That is the single biggest change a conversion makes to the building.

Drains run by gravity, so a bathroom cannot sit far from its stack without a deeper floor build-up. We place new risers first and plan wet rooms back to back around them, stacked floor above floor, so that one vertical run serves two units on every level. Units that share a riser are mirrored. The test fit already shows every stack, because moving one later moves walls on every floor.

Ventilation changes its logic too. Office systems serve large zones; each apartment needs its own control, a bathroom exhaust, a kitchen hood with a route to the outside and fresh air for the bedrooms. Ducts have depth, and their facade outlets show on the elevation, so we coordinate them with the facade drawings from the start. Each home also needs its own electrical panel and, in most rental models, separate metering, which can mean a larger electrical service for the building. The owner should ask the utilities about capacity early.

Fire separation, exits and sound between apartments

An office floor is one tenancy or a few. A residential floor is many separate homes, and the code treats each one as a compartment. Walls between units and between a unit and the corridor become fire-rated assemblies, floors separate homes stacked above each other, and every penetration for a pipe or a duct needs a tested firestop. The corridor layout is checked for exits, travel distance and dead ends, and the existing stairs are checked for whether they can serve the new number of occupants.

Sound is the part residents notice every night, so mistakes here stay visible longest. Office slabs were never asked to stop footsteps from the apartment above, and office partitions were built for privacy at a desk, not for sleep. The building code sets minimum ratings for airborne and impact sound between dwelling units; we check the edition the city enforces and design to it. In practice that means resilient layers under hard floors, double-stud or isolated walls between units, sealed outlets, and keeping the plumbing stacks away from the bedroom side of a party wall.

Unit mix and unit count: studios, one-bedrooms, corners and the deep middle

The unit count drives the economics, and the floor plate drives the unit count. Corners carry the most window and suit two-bedroom homes. The long sides of a moderate plate suit one-bedroom units. Deep sections near the core suit studios, where a sleeping alcove shares the window of the main room instead of needing its own.

Comparing two or three mixes on the same typical floor, with the count, the share of each type and the corridor length, makes the choice concrete. A double-loaded corridor along the middle of the floor is efficient on a narrow plate and wasteful on a deep one. Some owners look at co-living: our skyline article cites Gensler and Pew research that keeping bathrooms and kitchens near the existing office plumbing can lower construction cost. The mix also depends on whether the owner plans rentals or sales, and on whether affordable units are part of the deal (see the tax deferral below).

Outdoor space and parking come into the same conversation. A residential building often wants a roof terrace, a bicycle room and storage, which an office never had. New balconies hang off an existing structure and a facade designed without them, so they are a structural and envelope project, best tested early through facade design.

Seattle and Washington rules for commercial to residential conversions

Seattle has changed its rules for this kind of project. In July 2024 the City Council unanimously passed Ordinance 127054, which set out what counts as a residential conversion, gave broad exemptions from development standards when an existing structure is converted to housing, and exempted such conversions from Mandatory Housing Affordability requirements in Downtown, Commercial, Neighborhood Commercial and Seattle Mixed zones. In February 2025 the Council adopted a deferral of the 10.3% sales and use tax on construction costs for converting commercial space to housing: the developer makes 10% of the new units affordable to households at or below 80% of Area Median Income, and if they stay affordable for 10 years the deferred tax is permanently waived. Those 10% shape the unit mix, so we draw them into the test fit.

State law adds its own floor under every city. RCW 35.21.990, from the 2023 housing bill, required cities to update their codes by June 30, 2026, and it applies directly where a city has not. For dwelling units added within an existing building it limits what a city may require:

  • no parking requirement for the new units, though parking already needed for remaining uses can be kept;
  • density up to 50% more than the zone allows, inside the existing envelope, in zones that permit multifamily housing;
  • no permit denial based on existing nonconformity in parking, height, setbacks, elevator size or modulation, unless the city finds a significant detriment in writing;
  • changed portions meet the current energy code unless the new units total no more than 2,500 square feet or 50% of the building, whichever is greater, or the building meets its energy use intensity target.

An existing building here means one that received its certificate of occupancy at least three years before the application, and nothing in the law forces approval where life safety standards cannot be met. Building, mechanical, plumbing and fire reviews still apply in full. We check the current text of these rules for your address at the start of the project; Bellevue, Kirkland and other cities apply the state law through their own codes.

Costs that surprise owners, and how to phase the work

At the start the interiors look like the big number. In conversions the surprises sit elsewhere. New stacks and openings through concrete slabs, each with firestopping, are costly and multiply with every bathroom moved away from the core. Replacing a curtain wall or adding operable vents can turn an interior project into an envelope project. A seismic upgrade triggered by the change of use can outweigh the fit-out. Electrical and water service sized for an office may not carry dozens of kitchens. Older buildings may hold asbestos or other materials that must be surveyed and removed before demolition. And the corridors, shafts and thicker walls a residential floor needs reduce the sellable or rentable area compared with the office lease plan.

Our article on the skyline cites CBRE research with very wide cost ranges per square foot, and those spreads are the point: the price comes from the specific building and the purchase price behind it, so we give no general figure. What the study can give is the list of cost drivers for your building, ranked, so the cost consultant and the contractor price the right things.

Phasing can keep part of the income. Ground-floor retail or a few office floors can stay leased while upper floors convert, provided exits, systems and construction access are separated. A useful step is to build one model unit first: it tests the details, the acoustic build-up and the finish level before they repeat on every floor. Approvals for the whole building usually come before the soft strip-out, because demolition opens the slabs and walls that the drawings depend on.

What the conversion drawings contain and who signs them

After the feasibility study the project moves through architecture and units, interiors, and drawings for permits and construction. The architectural set covers the existing and proposed plans for every floor type, unit plans, sections that show the new floor build-up and ceiling zones, the riser and shaft strategy, fire separation and exit plans, facade changes, and details of party walls, floors and firestops. The interior package covers the lobby, corridors, the model unit and the finish schedule for all apartments, shown in renderings. Structural, mechanical, plumbing, electrical and fire engineers work on the same model, and we coordinate them. Our architects develop the documentation to local codes; drawings that require a local license are signed by licensed professionals we work with.

Our own projects in existing buildings show the approach, though none of them is a conversion to housing. For Copper Hall in Kharkiv (660 m², 2022) we designed the reconstruction of a 1990s building into a new office building on the red line of the historic center: a KME copper facade, panoramic glazing built on Passive House technology, a second floor that cantilevers over the first, SCHUCO windows with a 120 mm profile and a ventilation system integrated with the smart home. The Copper Hall interior turned the glazed ground floor into a transformable hall for conferences, exhibitions or dining. In Residence 11 (2024) an apartment that the builder planned with two rooms and one bathroom became four rooms and two bathrooms, growing from 65 to 103 m², terraces included, by adding a full floor where the height allowed. Adding a bathroom where none was planned is, at small scale, the same riser and drain problem a conversion solves on every floor.

The fee is discussed individually. It depends on the size of the building, how many floors repeat and how many are unique, the quality of the existing drawings, whether a measured survey is needed, the number of unit types and how far the interior scope goes. Design supervision during construction is discussed in the same way.

When this service fits, and when another one fits better

This service fits when a whole commercial building, or several floors of it, may become homes and the first question is whether it can. If the building stays an office and needs a new workplace, office design is the right page; to test an office program on a candidate lease, see space planning. A single apartment with moved walls and wet rooms is floor plan redevelopment, and an older house is remodeling design. New construction, additions and a new building on the same lot belong to architecture. Send us the address, whatever drawings you have and the use you have in mind, and we will tell you what the first study should answer.