Luxury Home Design Luxury Home Design

Luxury Home Design

  • Timeline:

    discussed individually*

  • Project’s cost:

    discussed individually**

  • Architectural supervision:

    discussed individually

* Depends on the Project

** Price depends on the style and complexity of the Project.

Your home should be an exact reflection of how you live. Custom home design is the difference between a house and your house.

At DeZZign, we design custom homes from the ground up for clients in Seattle, Bellevue, Kirkland, and across the Pacific Northwest. Our approach combines European design precision with a deep understanding of local building codes, site conditions, and the PNW climate.

What custom home design includes

- Site analysis — orientation, views, setbacks, topography
- Concept and massing — overall form, volume, relationship to the land
- Floor plan development — layout optimized for your daily life
- Exterior design — facade, materials, roofline, fenestration
- 3D visualizations — photorealistic exterior and interior renderings
- Working drawings — full architectural documentation for permitting and construction

Our approach

We design architecture and interiors together. The exterior and interior are conceived as one coherent vision from day one. Our founder has hands-on construction experience in the Pacific Northwest — our designs are not just beautiful, they are buildable, code-compliant, and realistic within your budget.

For Seattle Metro Area clients

We understand Washington State residential building codes, King County and City of Seattle permit requirements, energy code compliance, and the specific challenges of building in a wet, seismically active climate.

Our portfolio

Stages

Q&A

How is custom home design different from buying a house plan online?

An online plan is designed for nobody in particular. A custom home is designed for you — your site, your lifestyle, your family, your preferences. Every room placement, every window, every ceiling height is a decision made with your specific life in mind. The result is a home that works exactly the way you live.

How long does the custom home design process take?

From initial brief to permit-ready documentation, a typical custom home project takes 4-8 months. This includes concept development (4-6 weeks), design development (6-8 weeks), and working drawings and permit coordination (8-12 weeks). Construction timeline is separate and depends on scope.

Do you work with clients outside Seattle?

Yes. We work with clients across Washington State and internationally. All consultations and design presentations can be conducted remotely. We use high-quality 3D visualizations and virtual walkthroughs so you can fully experience the design before construction begins.

Can you design to a specific budget?

Yes. We design with your construction budget in mind from day one. We specify materials and systems that achieve the aesthetic you want within the budget you have. We can also provide a cost estimate review at key design stages so there are no surprises when you go to bid.

Who prepares and signs the permit documents?

DeZZign provides architectural concepts, design development, and full documentation, developed by our own architects to local codes. For projects requiring Washington State stamped permits, the drawings are signed by locally licensed professionals we work with, together with structural engineers where needed. This gives you European design quality with local code compliance.

What makes DeZZign different for custom home design in Seattle?

Three things. First, European design training — we bring a level of spatial thinking, material culture, and aesthetic rigour that is rare in the US residential market. Second, construction knowledge — our founder has hands-on PNW construction experience, so we design things that can actually be built. Third, integrated approach — architecture and interior design are developed together from day one.

Do I need a geotechnical report for a custom home in Seattle?

Often yes. SDCI's permit guidance calls for a geotechnical report on projects with exterior work or foundation alterations when the site contains a steep slope, potential slide, known slide, liquefaction, landfill or peat settlement prone area. We check the mapped areas for your address during site analysis, before the concept, because the report can change the foundation, the position of the house and the budget.

Does Washington's energy code require a heat pump in a new house?

The heat pump sections were removed from the 2021 residential code by a rule effective March 15, 2024 (WSR 24-03-084). Heating choice now works through credits: under that rule a heat pump earns 3.0 credits and combustion heating at federal minimum efficiency earns 0, while a house over 5,000 square feet of conditioned area needs 9.0 credits in total. The 2024 codes are scheduled to take effect on May 3, 2027, so we check the edition on the project date.

How do tree rules affect where a house can go in Seattle or on Mercer Island?

They can decide the footprint. In Seattle the starting tree protection area around a Tier 2 tree is a radius of one foot per inch of trunk diameter, and it can be adjusted under the code. Mercer Island's handout says at least 30% of Large Trees (10 inches or more at 4.5 feet) must be retained, and it restricts cutting in geologic hazard areas from October 1 to April 1. We plot the trees on the survey before drawing the plan.

Can the interior and landscape be designed later?

They can, but floor levels, window positions, lighting and drainage are set while the house is being drawn, and changing them later costs more. If you plan to phase the work, we still note the key interior and site decisions in the 3D model during the concept, so that the later stages can follow from the house rather than fight with it.

Do you have any more questions?

Choose a method of communication convenient for you

  • Phone
  • Mail
  • Telegram
  • Viber
  • WhatsApp

Contact us

Custom home design in Seattle, Bellevue and Kirkland

DeZZign designs private houses from an undeveloped lot to a permit-ready drawing set, with the exterior, the interior and the landscape developed together. This page covers the whole house as one commission: a new custom or luxury home for a particular family on a particular piece of ground in Seattle, on the Eastside or elsewhere in Washington State.

Our published house cases are in Ukraine, and they show how we carry a house through its decisions. A Mercer Island slope gets its own survey and its own check of the local rules. Ascetic House is 487 m² (about 5,240 sq ft) for a large family in the Kyiv region. House for Cosmopolitan is 300 m² (about 3,230 sq ft) on a single level near the Saltivske reservoir, with construction completed in 2021. Mansion for the Leader is a 465 m² design in a pine forest in the Kharkiv region, and the house in Yuzhny is 280 m² for a family of three.

The local part of our knowledge comes from another direction. Our founder went to work directly on American residential construction sites to learn local practice, labor and sequencing from the inside, and that experience shapes how we detail and check drawings for this market.

Reading the lot before the first sketch

We open a custom home project with the ground, since the lot can remove options that no amount of design will bring back. A boundary and topographic survey comes first, then a review of zoning, setbacks, height limits, easements, utilities and mapped hazards for the address. We walk the site for views, sun, neighbors' windows, standing water and the way a car reaches the door.

Seattle gives a clear example of why this comes early. SDCI's permit guidance calls for a geotechnical report on projects with exterior work or foundation alterations when the site contains a steep slope, potential slide, known slide, liquefaction, landfill or peat settlement prone area. A report like that can change the foundation, the position of the house and the budget, so it belongs before the concept.

Trees are the other early constraint. Under the Seattle tree code, the starting tree protection area around a Tier 2 tree is a radius of one foot per inch of trunk diameter, measured at standard height, and it can be adjusted under the code. A 30-inch tree therefore begins with a 30-foot radius, which can take a real bite out of a narrow lot. We plot every significant tree on the survey and test the footprint against those circles before anyone falls in love with a shape.

The program: how the family will use the house

A program is a written list of rooms, sizes and relationships, and we build it from routines. Who gets up first? Where do wet coats and boots go on a November evening? How many guests stay overnight, and for how long? Does anyone work from home on calls?

Ascetic House grew out of this kind of conversation. Its owner was a young professional athlete, so the program put a full spa zone and a 25-meter pool into daily use for recovery and exercise, and the project was treated as a place for permanent living. In Yuzhny the brief was smaller and more specific: two adults and a teenager, with a feeling of transparency and lightness, and spaces that flow softly from one zone to the next.

Garages deserve their own line in a Washington program. A garage that looks fine with two small cars on the drawing can be uncomfortable with two large SUVs once doors have to open and people have to walk around them. We draw the vehicles you actually own, plus storage, bikes and charging.

We count conditioned floor area from the first program draft, because the energy code reacts to it, as a later chapter shows.

Massing and orientation in a wet, grey climate

Massing means the overall form of the building and how it sits on the land. In the Puget Sound region, roof shape and overhangs do practical work: they keep rain off walls and windows, and they decide how much low winter light reaches the rooms. Views often pull a house one way while sun pulls it another, so we model both.

Our cases show three different answers to form. Cosmopolitan was made single-level because of the client's wishes and the existing terrain, and a roof lantern brings daylight deep into the plan. Mansion for the Leader keeps a simple pitched roof, a traditional archetype with a Scandinavian note, in a modern composition. Yuzhny has a flat membrane roof, which suits its light, restrained look and asks for careful drainage details.

Glass is the decision clients ask about most in this market, and we treat it as a number. Glazing in Mansion for the Leader equals a quarter of the area of all facades. In Ascetic House, with Schüco panoramic systems with increased thermal insulation, it reaches almost 30% of the facade. Each extra square foot of glass adds cost and heat loss, and it also takes away wall that the structure may need. Glass should earn its place: the forest, the water, the morning kitchen.

Structure: wood frame, steel and foundations on a slope

Wood frame is what local crews build every day, which makes it the natural starting point for a house here. Its limits appear with the kind of architecture luxury clients often want. Western Washington is seismically active, and a wood-frame house resists lateral forces largely through its shear walls. A long glass wall removes exactly that length, so a clean corner or a wide opening may call for a steel frame. We raise this while the concept is still soft, with a structural engineer looking at the massing.

Slopes move the money from above ground to below it. Depending on the geotechnical recommendations, a hillside house may need deep foundations, retaining walls and drainage behind them, and those items are invisible in a rendering. We therefore compare at least one simpler position on the lot, because shifting a house a few feet can sometimes remove a retaining wall.

Long spans, cantilevers, stone cladding, roof terraces and pools all add load. The structural engineer calculates these parts, and our architects coordinate those sheets with the architecture so that a beam does not land in a recessed light line.

Washington energy code: heat pumps, credits and house size

A common summary says the state requires a heat pump in most new homes. The 2021 residential code was first written that way, but the Building Code Council removed the heat pump space heating section (R403.13) and the heat pump water heating section (R403.5.7) in a rule effective March 15, 2024, and shifted the incentive into energy credits. That rule (WSR 24-03-084) gives these equalization credits in Table R406.2 for most houses:

  • heat pump: 3.0 credits;
  • heat pump with electric or combustion backup: 1.5 credits;
  • electric resistance only: 0.5 credits;
  • combustion heating at federal minimum efficiency: 0 credits.

The same rule sets the total a dwelling must reach: 8.0 credits for a typical house and 9.0 once it exceeds 5,000 square feet of conditioned floor area. A large home on a gas furnace therefore has to find all nine credits in the envelope, the air sealing, the ventilation and other options. The chosen options and their points have to be identified on the drawings included with the permit application, so this is an architectural decision as well as a mechanical one.

Editions change. The Washington State University energy program reports that the 2024 codes take effect on May 3, 2027, so a house designed now may be reviewed under a different edition depending on its submission date. We check the edition and any local amendment for your address on the project date. Mechanical rooms, duct routes, ventilation with heat recovery and any rooftop solar then get space in the plan early, before ceilings are set. In Ascetic House, the concealed systems and smart-home infrastructure were developed with the architecture and furniture as one environment, which is why they stay out of sight.

Facade materials for a house that stays wet for months

Our houses use a short palette: stone, wood, glass and metal. Cosmopolitan is clad in thermowood, clinker brick and standing-seam metal cassettes. Ascetic House uses concrete, clinker, quartzite, panoramic glazing and a seam roof. Yuzhny combines clinker brick, porcelain stoneware and thermowood. Bringing any of those to Puget Sound changes the detailing more than the look.

Behind the cladding, a drained and ventilated cavity lets water that gets past the surface run out and lets the wall dry. Window and door openings interrupt the wall's water protection, so flashing has to be integrated with them, and damage from a poor opening may stay hidden for years. Material by material, we consider the following:

  • Thermally modified wood resists rot better than untreated wood, but it turns silver in daylight and unevenly under deep eaves, so the family should see aged samples.
  • Clinker brick absorbs little water, which suits this climate. The mortar joints and the support of the brick at each floor still need detailing.
  • Standing-seam metal moves with temperature, so its fixings must allow for that, and the seam direction has to work with the roof slope.
  • Quartzite is a natural metamorphic stone, not the engineered quartz sold for countertops. Slabs vary, so we pick them with the client and agree on how they are anchored.

Permits in Seattle, Bellevue and Mercer Island

Each city runs its own review, and the critical areas and trees are where they differ most for a custom home. In Seattle the path goes through SDCI, with the geotechnical and tree items above feeding the construction permit. On Neighborhood Residential lots, when SDCI decides whether a Tier 2 tree may go to reach maximum lot coverage, tree protection areas and leftover strips under 10 feet wide between such an area and a setback do not count as buildable.

In Bellevue, a Critical Areas Land Use Permit with a Critical Areas Report is required to modify steep slope critical areas, their buffers and structure setbacks (LUC 20.25H.255). The report has to show that the modification leads to equivalent or better functions and values than the standard rules would. One published single-family decision was applied for on October 20, 2022 and decided on August 22, 2024. That is a single case and no forecast, yet it explains why we plan around such a report when a footprint touches a slope.

Mercer Island's tree handout, dated 2021, states three things that can reshape a concept. Construction work needs a tree permit to remove any Large Tree (10 inches in diameter or more at 4.5 feet), Exceptional Tree or tree in a critical area. At least 30% of Large Trees on the site have to be retained. And cutting in geologic hazard areas or protected slope areas is prohibited from October 1 to April 1 unless specifically authorized, which can move a start date by months.

On the water, shorelands extend 200 feet landward from the ordinary high water mark under RCW 90.58.030. A single-family residence no taller than 35 feet above average grade is not treated as substantial development, though the local shoreline program still applies. Our waterfront home design page goes further into this.

Our architects develop the documentation to local codes, and drawings that require a local license are signed by licensed professionals we work with. Permit timing depends on the city and the site, and we do not promise review durations that belong to the reviewer.

What the drawing set contains, and who produces each part

After the concept and 3D visualizations are approved, the design develops into working drawings. A complete set for a custom house typically holds a site plan based on the survey, foundation and floor plans, a roof plan with drainage, elevations, building and wall sections, details of window heads, sills and roof edges, door and window schedules, lighting and electrical layouts, and specifications of materials and equipment. The energy credit selections sit on the sheets as well.

A surveyor provides the base map, a geotechnical engineer the soil recommendations and, where trees are involved, an arborist provides the assessment. The structural engineer owns the calculations and the framing and foundation sheets. Our architects hold all of it together and resolve conflicts between them. The contractor prices and builds from the set, and during construction we visit the site, answer questions and adjust drawings under project support. You approve the program, the concept, the materials and the budget at each stage.

Interior and landscape in the same project

We develop the architecture, the rooms and the site together, so a window is positioned once, for the facade, the furniture and the garden view at the same time. Lighting decided late often means opening a ceiling again, and a cabinet drawn without the electrical plan ends up fighting an outlet. Developing these layers together avoids both.

The clearest case is the Cosmopolitan interior, where DeZZign was responsible for the interior design and its realization: construction, materials, furniture and lighting. Poliform and Boffi set the language of the built-in elements, Rimadesio kept partitions and doors visually light, and large openings bring the pine forest into the living spaces. The Ascetic House interior went from the architectural concept through interiors and construction between 2020 and the end of 2021, with one restrained set of stone, wood, concrete, microcement and porcelain stoneware.

Outside, grading, drainage, terraces and planting depend on the floor levels, so landscape design starts from the same survey. In Mansion for the Leader, a summer pool directly adjoins the house, beside a terrace with a barbecue area looking at the forest and the pond, and it was designed along with the house.

What moves the cost of a luxury home design

Our design fee and timing for this service are discussed individually, after we have seen the program and the site. The factors that move them are concrete: lot difficulty (slope, critical areas, shoreline, access), conditioned area, the amount and type of glazing, structural spans, how many facade materials meet, how far the interior and landscape go in the same contract, and how many options you want to review.

Construction cost responds to the same list. Changes grow more expensive in a predictable order. Moving a wall in the concept costs an afternoon of drawing, moving it after engineering means coordinated sheets, and moving it after framing means demolition. Yuzhny offers a useful budget lesson: many interior elements came from Ukrainian makers of cabinet and upholstered furniture, which kept the budget acceptable and shortened the time before the family moved in. For market figures, fee structures and what to ask a designer, see our article on how much a luxury house design costs in Seattle, which presents them as market ranges rather than our price.

When this service fits, and when another one is a better start

This service fits a new, single-family house where the land, the program, the architecture, the interior and the outdoor spaces are all open questions and you want one team across them. Other starting points may serve you better:

  • Architecture is our general architectural service for private, commercial and mixed-use buildings, with its own sketch and working documentation packages. Choose it for a building that is not a family home, or for a defined architectural scope.
  • House plans focuses on the plan and drawing side: floor plans, layout optimization and architectural drawings, including for an addition or a redesign of an existing property.
  • Whole-home interior design suits a house whose shell is already designed or built, when one concept should run through every room.

If you have a lot under consideration and have not closed on it, tell us early, since a look at its survey, slope and trees before purchase is the least expensive review in this whole process.